Data Center Installation Indonesia

Data Center Installation Service

PT NPS Pemuda Berdikarisma menyediakan layanan Data Center Installation Service untuk kebutuhan pembangunan, ekspansi, dan upgrade infrastruktur mission-critical. Scope pekerjaan dapat mencakup instalasi power system, precision cooling, rack dan containment, cabling, grounding, monitoring, testing commissioning, serta dokumentasi handover agar site siap dioperasikan dengan lebih aman dan terukur.

Power, cooling, rack, and facility installation
Cabling, grounding, containment, and integration support
Testing, commissioning, and operational handover
As-built drawing, test report, and documentation
Survey-Based Installation Planning
End-to-End Project Support
15+ Years Experience
Data Center Installation Service in Indonesia
E2E Project Delivery Support Survey, installation, testing, commissioning, documentation, and operational handover.
Installation Scope

Data Center Installation Services

Layanan instalasi NPS disusun berdasarkan kondisi site, critical load, target reliability, layout ruangan, service access, dan rencana pengembangan agar infrastruktur data center dapat dipasang secara rapi, aman, dan mudah dipelihara.

01

Power Infrastructure Installation

Instalasi UPS, battery cabinet, PDU, STS, panel distribusi, busway, kabel power, dan grounding system dengan memperhatikan kapasitas beban dan jalur distribusi daya.

Power system
02

Precision Cooling Installation

Pemasangan precision cooling, CRAC/CRAH, in-row cooling, piping, drainage, refrigerant line, dan support terkait cooling distribution sesuai kebutuhan thermal management.

Cooling system
03

Rack, Containment & Facility Support

Instalasi rack, cabinet, raised floor, cable tray, ladder, hot/cold aisle containment, dan komponen fisik lain agar ruang data center lebih terstruktur.

Physical infrastructure
04

Cabling, Grounding & Labeling

Pekerjaan kabel power, kontrol, komunikasi, labeling, routing, termination, dan grounding untuk membantu menjaga kerapian serta kemudahan troubleshooting.

Cabling & grounding
05

Monitoring, Safety & Security Integration

Support pemasangan EMS, water leak detection, fire suppression interface, CCTV, access control, dan integrasi monitoring sesuai scope proyek.

Monitoring & safety
06

Testing, Commissioning & Handover

Pengujian fungsi, commissioning, checklist, test report, as-built documentation, dan handover agar pelanggan memiliki catatan instalasi yang jelas.

Commissioning
System Coverage

Installation Coverage for Critical Facilities

NPS dapat mendukung instalasi berbagai komponen data center, server room, network room, colocation support area, dan edge site sesuai desain, scope pekerjaan, serta requirement operasional pelanggan.

Power Systems

Critical Power Distribution

Instalasi sistem daya cadangan dan distribusi daya untuk menjaga jalur supply ke perangkat kritikal.

UPS and battery cabinet PDU, STS, and electrical panel Busway, cable, and grounding
Cooling Systems

Thermal Management Support

Pekerjaan instalasi cooling untuk membantu menjaga temperatur, airflow, dan kapasitas pendinginan sesuai kebutuhan ruangan.

Precision cooling / PAC / CRAC In-row cooling and CDU support Piping, drainage, and refrigerant line
Physical Infrastructure

Rack, Floor & Containment

Pemasangan infrastruktur fisik untuk membantu ruang data center lebih rapi, scalable, dan mudah dioperasikan.

Server rack and cabinet Raised floor and cable support Hot aisle / cold aisle containment
Monitoring & Safety

Facility Visibility & Protection

Support instalasi monitoring, safety, dan security untuk meningkatkan visibility serta kontrol terhadap kondisi ruangan.

EMS and DCIM integration support Water leak and fire system interface CCTV and access control support
Operational Outcomes

Installation Outcomes for Reliable Data Center Operation

Instalasi data center yang baik tidak hanya selesai secara fisik, tetapi juga harus siap dipelihara, mudah ditelusuri, dan mendukung operasional jangka panjang.

01

Cleaner and more traceable infrastructure

Routing, labeling, termination, dan dokumentasi yang rapi membantu tim facility melakukan troubleshooting dan maintenance dengan lebih mudah.

02

Lower start-up and commissioning risk

Pekerjaan instalasi dilengkapi checklist, testing, dan commissioning sehingga potensi defect dapat ditemukan sebelum sistem digunakan penuh.

03

Better capacity readiness

Instalasi mempertimbangkan beban kritikal, ruang ekspansi, jalur service, dan kebutuhan future growth agar tidak cepat menjadi bottleneck.

04

Integrated power and cooling support

Koordinasi antar sistem power, cooling, monitoring, dan facility support membantu mengurangi gap saat handover ke tim operasi.

05

Audit-ready handover records

Dokumentasi seperti as-built drawing, test report, checklist, dan service record membantu proses audit, review, dan improvement berikutnya.

06

Smoother transition to operation

Handover yang jelas membantu internal team memahami status instalasi, batasan scope, rekomendasi, dan langkah operasional setelah commissioning.

NPS Method

Data Center Installation Framework

NPS menggunakan pendekatan bertahap agar instalasi berjalan lebih terstruktur dari site survey hingga handover, dengan koordinasi teknis yang jelas pada setiap fase pekerjaan.

Step 01

Assess

Review kondisi site, existing infrastructure, access, load profile, risk area, dan kebutuhan teknis proyek.

Site survey Requirement review Risk identification
Step 02

Plan

Menyusun scope, layout, method statement, schedule, manpower plan, material readiness, dan coordination point.

Work method Project schedule Material planning
Step 03

Install

Melakukan instalasi perangkat, kabel, support, grounding, containment, dan integrasi sesuai scope pekerjaan yang disepakati.

Equipment installation Cabling and termination Quality control
Step 04

Commission

Melakukan functional test, start-up support, commissioning checklist, setting verification, dan issue follow-up.

Functional testing Commissioning report Punch list follow-up
Step 05

Handover

Menyerahkan dokumentasi, as-built, report, recommendation, dan catatan operasional untuk mendukung fase operasi.

As-built documentation Service record Operational handover
FAQ

Frequently Asked Questions

Pertanyaan umum tentang layanan Data Center Installation Service NPS untuk pembangunan, ekspansi, dan upgrade infrastruktur data center.

Data Center Installation Service mencakup dukungan instalasi infrastruktur data center seperti UPS, PDU, panel, precision cooling, rack, cable tray, grounding, monitoring system, safety system, testing commissioning, dan dokumentasi handover sesuai scope proyek yang disepakati.
Ya. NPS dapat mendukung instalasi untuk pembangunan baru, ekspansi existing site, relocation, equipment replacement, dan upgrade sistem tertentu. Scope pekerjaan akan ditentukan setelah site survey, review desain, dan konfirmasi kebutuhan operasional.
NPS dapat mendukung instalasi sistem power, cooling, rack, containment, grounding, cabling, EMS, water leak detection, fire suppression interface, CCTV, access control, dan DCIM integration support sesuai kebutuhan proyek.
Testing dan commissioning dapat dimasukkan dalam scope pekerjaan. Aktivitas ini biasanya meliputi visual inspection, functional test, start-up support, parameter verification, checklist, punch list, dan laporan commissioning.
Durasi instalasi tergantung skala proyek, kesiapan site, jumlah perangkat, kompleksitas integrasi, akses kerja, dan jadwal operasional pelanggan. NPS akan menyusun estimasi timeline setelah site survey dan review scope pekerjaan.
Start with a Site Survey

Ready to Plan Your Data Center Installation?

Konsultasikan kebutuhan instalasi data center Anda dengan tim NPS. Kami dapat membantu melakukan site review, menyusun scope pekerjaan, menilai kesiapan infrastruktur, dan menyiapkan proposal instalasi sesuai kebutuhan teknis serta operasional bisnis Anda.

Site survey Installation planning Testing commissioning Handover documentation